Sign In | Join Free | My uabig.com |
|
Place of Origin : Sichuan, China (Mainland)
Brand Name : Forster
Model Number : CJ-22-65/1*7A
Supply Ability : 30 Set/Sets per Month
Packaging Details : Wooden Box
MOQ : 1 Set/Sets
Price : Negotiable
Certification : CE/TUV/ISO9001/From-E
Payment Terms : L/C, T/T
Delivery Time : 120days
Designer head : 166 - 350m
Traffic : 0.21 - 0.31 m / s
Design speed : 750 - 1000 r / min
Power : 286 -- 869 kw
Driving mode : Straight league,Between the united
Diameter : 200 mm
Rated rotated speed(r/m) : 1000 R / M
Material : Stainless Steel
Generator type : 3 Phase AC Permanent-magnet
Keyword : Small hydro generator
Port : Shanghai / Shenzhen
Automation Equipment Configuration 800kw Turbina Pelton Precio Generator For Mhpp
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Product features:
The Pelton turbine is a special hydraulic propeller that draws a free jet with kinetic energy, rushes to the runner bucket, and rotates the runner to do work, thus completing a hydraulic prime mover that converts water energy into mechanical energy. The Pelton turbine is suitable for high-head, low-flow power stations. It converts the water from the pressure pipeline into a high-speed jet through the nozzle, tangentially impacts the runner, and drives the rotor to rotate, thereby driving the generator rotor to generate electricity. In the impact turbine, the difference between the working jet and the relative position of the runner and the number of work can be divided into a tapping turbine, a slanting turbine and a double-click turbine.
1. suitable for high head,small flow and flow changes in large runoff hydropower station.
2. With the power plant investment is small,compact units structure characteristics.
3. Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.
4. Suitable for high head,small flow station in mountainous area.
5. A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.
Pelton tubine generator unit | Generator | Unit output (kw) | Gevernor or Regulating work | Valve | ||||||
Turbine | ||||||||||
Type | Water head(m) | Discharge (m³/s) | Output(kw) | Speed (r/min) | Type | Capacity (kw) | ||||
CJA237/475-1*7 | 200 | 0.232 | 383.2 | 750 | SFW320-8/850 | 320 | 358.3 | Manual CJWT- I BWT-3000 | DN300 | |
220 | 0.243 | 440.5 | SFW400-8/850 | 400 | 414.1 | |||||
240 | 0.254 | 502 | SFW500-8/850 | 500 | 474.4 | |||||
260 | 0.264 | 572 | 1000 | SFW500-6/850 | 500 | 540.5 | ||||
280 | 0.274 | 643.5 | SFW630-6/990 | 630 | 608.1 | |||||
300 | 0.284 | 714.6 | SFW630-6/990 | 630 | 675.3 | |||||
CJA237/475-W-90/1*4.5 | 275 | 0.086 | 176.3 | 750 | SFW160-8/650 | 160 | 162.9 | Manual CJWT- I BWT-3000 | DN250 | |
300 | 0.0896 | 200.4 | SFW200-8/740 | 200 | 185.8 | |||||
325 | 0.0932 | 225.8 | SFW200-8/740 | 200 | 209.3 | |||||
350 | 0.0969 | 252.8 | SFW250-8/740 | 250 | 235.1 | |||||
375 | 0.1005 | 279.8 | SFW250-8/740 | 250 | 260.2 | |||||
400 | 0.103 | 309 | 1000 | SFW250-8/740 | 250 | 287.4 | ||||
425 | 0.1077 | 341.3 | SFW320-6/740 | 320 | 320.1 | |||||
450 | 0.1098 | 368.4 | SFW320-6/740 | 320 | 345.5 | |||||
500 | 0.119 | 496 | SFW500-6/850 | 500 | 456 | Manual CJWT- I BWT-6000 | ||||
600 | 0.131 | 650 | SFW630-6/990 | 630 | 610 | |||||
700 | 0.141 | 823 | SFW800-6/990 | 800 | 770 | |||||
CJA237/475-W-90/1*7 | 260 | 0.261 | 572 | SFW500-8/850 | 500 | 526 | CJT- II | DN400 | ||
280 | 0.271 | 636 | SFW630-8/990 | 630 | 585 | |||||
300 | 0.28 | 700 | SFW630-8/990 | 630 | 651 | |||||
320 | 0.289 | 766 | 750 | SFW800-8/990 | 800 | 712 | ||||
340 | 0.298 | 834 | SFW800-8/990 | 800 | 775 | |||||
360 | 0.307 | 899 | SFW800-8/990 | 800 | 836 | |||||
380 | 0.315 | 968 | SFW1000-8/1180 | 1000 | 900 | |||||
400 | 0.327 | 1093 | SFW1000-6/1180 | 1000 | 1021.9 | |||||
420 | 0.335 | 1159 | SFW1000-6/1180 | 1000 | 1189 | |||||
440 | 0.343 | 1287 | 1 nnA | SFW1250-6/1180 | 1250 | 1203.3 | ||||
460 | 0.351 | 1382 | 1 uuu | SFW1250-6/1180 | 1250 | 1292.2 | ||||
480 | 0.359 | 1476 | SFW1250-6/1180 | 1250 | 1380.1 | |||||
500 | 0.366 | 1567 | SFW1600-6/1180 | 1600 | 1465.1 | |||||
CJA237/475-W-90/1 x 11 | 100 | 0.4 | 333 | 500 | SFW320-12/990 | 320 | BWT-6000 CJWT- I | DN400 | ||
120 | 0.44 | 455 | SFW400-12/990 | 400 | ||||||
140 | 0.478 | 566 | SFW500-12/990 | 500 | 520.7 | |||||
160 | 0.511 | 699 | 600 | SFW630-10/1180 | 630 | 643.1 | ||||
180 | 0.542 | 836 | SFW800-10/1180 | 800 | 769.1 | |||||
200 | 0.572 | 939 | SFW700-10/1180 | 800 | 863.9 | |||||
240 | 0.6 | 1097 | 750 | SFW1000-8/1180 | 1000 | 1020.2 | ||||
260 | 0.626 | 1275 | SFW1250-8/1430 | 1250 | 1192.1 | |||||
280 | 0.652 | 1451 | SFW1250-8/1430 | 1250 | 1356.7 | |||||
CJA237/475-W-100/1 x11 | 180 | 0.536 | 804 | 500 | SFW800-12/1430 | 800 | 739.6 | CJWT- 1 BWT-6000 | DN400 | |
200 | 0.565 | 953 | 600 | SFW800-10/1180 | 800 | 876.7 | ||||
220 | 0.593 | 1112 | SFW1000-10/1430 | 1000 | 1023 | |||||
240 | 0.62 | 1262 | SFW1000-10/1430 | 1000 | 1161 | |||||
260 | 0.645 | 1406 | SFW1250-10/1430 | 1250 | 1293 | |||||
280 | 0.669 | 1561 | 750 | SFW1250-10/1430 | 1250 | 1436 | ||||
300 | 0.693 | 1733 | SFW1600-10/1430 | 1600 | 1594 | |||||
320 | 0.715 | 1930 | SFW1600-10/1430 | 1600 | 1775 | |||||
340 | 0.737 | 2138 | SFW2000-10/1730 | 2000 | 1966 | |||||
360 | 0.758 | 2315 | SFW2000-10/1730 | 2000 | 2129 | |||||
380 | 0.779 | 2497 | SFW2000-10/1730 | 2000 | 2297 |
Installation picture:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
![]() |
Automation Configuration 800kw Pelton Turbine Generator Compact Units Images |